The Rise Phase 2 Condos — Winnipeg Pre-Construction
The Rise Phase 2 is a developer selling & resale pre-construction condos development by StreetSide Development Corporation in Winnipeg. Get pricing, floor…
The Rise Phase 2 Quick Facts
| Project Name | The Rise Phase 2 |
|---|---|
| Developer | StreetSide Development Corporation |
| Address | 105 South Town Road |
| City | Winnipeg |
| Region | Winnipeg |
| Building Type | Condo |
| Sales Status | Developer Selling & Resale |
| Storeys | 7 |
| Pricing | Register for pricing |
| Maintenance Fees | $0 / sq ft / month |
| Occupancy | 2022-01-01 |
| Walk Score | 27 |
| Transit Score | 30 |
About The Rise Phase 2 in Winnipeg
The Rise Phase 2 Condos is a completed condominium development by StreetSide Development Corporation at 105 South Town Road in Winnipeg. The project is 7 storeys tall and contains 95 suites. The Rise Phase 2 Condos was completed in 2022. The location has a Walk Score of 27 and a Transit Score of 30.
The Rise Phase 2 is also marketed as The Rise Phase 2 Condos, and listed in the developer's material as The Rise Phase 2 Condos.
The Rise Phase 2 Renderings & Gallery





















The Rise Phase 2 Floor Plans & Price List
Floor plans, the current price list and deposit structure for The Rise Phase 2 are released to registered buyers first. Request the The Rise Phase 2 floor plans and pricing.
Amenities & Finishes
- ["-Owners Lounge\n-Underground Parking\n-Outdoor Courtyard\n-Kitchenette\n-Lobby\n-Visitor Parking\n-Fitness Studio\n-Storage Lockers\n-Pool Table\n-Pet Friendly\n-Outdoor Swimming Pool"]
SUPERSTRUCTURE AND BUILDING SHELL Pre-cast concrete pile foundation. Parking garage lower level with cast in place concrete walls, ramp, and floor. Hollow core concrete slabs with 2” concrete topping between parkade and main floor. Total pre-cast concrete and steel structure from main to seventh floor. Hollow core concrete floor system with gypcrete topping on second to seventh floor. Open web steel joist roof system Ballasted EPDM Roof system Minimum of R-20 insulation for exterior walls. Minimum of R-40 roof insulation. Precast concrete balconies or concrete slab on grade as per plans. Weather resistant building wrap system. Steel stairs and landings with steel rails in stairways. EXTERIOR FINISHES Stucco insulated finish system, masonry, cement board and composite panels. Balcony columns cladded with masonry from main to third floor. Aluminium railings on balconies Six foot high aluminium framed privacy screen with frosted glass between double suite balconies. Composite cladding at main entry and seventh floor balcony canopies. 2’x2’ pavers on main floor terraces. Aluminum entry doors and windows at main entry. WINDOWS Tri-pane vinyl windows with argon gas fill, low-E coating. Balcony doors are dual glazed with argon gas fill, low-E coating, and exterior metal cladding. 3-season balcony enclosures are not permitted on this building. SOUND PROOFING Walls between suites are precast concrete panels sandwiched between steel studs with insulated cavities and drywall. (estimated STC rating of 69). Floors are constructed of hollow core concrete slabs with gypcrete floor topping, (estimated STC rating 50 with cushioned vinyl flooring). ELECTRICAL SYSTEMS Decora light switches throughout suites. Designer light fixture package. Individual suite electrical metering. Pre-wired cable TV and telephone available for MTS and/or Shaw. Rough-in for phone/TV jacks located in each bedroom and living room. MECHANICAL SYSTEMS Heated underground parking with carbon monoxide sensors. Matte Black plumbing fixtures. Pressurized and heated/air conditioned corridors. Each suite is equipped with ducted forced air heating & cooling, with a fan coil located in the suite entrance or storage room All suite condensing units (air conditioning) are located on the roof of the building. Kitchen and laundry exhausted horizontally to the exterior. Central bathroom exhaust. Each suite contains a 39 gallon electric hot water tank with drain pan. Stackable washer/dryer units are available as an upgrade. ELEVATORS 2 passenger elevators with emergency call feature located near the main building entry. Protection pads for elevators are provided. COMMON AREAS Floor tile at the main & rear entry areas and in elevators. Commercial grade carpet with carpet base. VCT tile at basement elevator lobby. Mail boxes serviced by Canada Post at main entry. SUITE INTERIOR FINISHES Dulux Diamond wall paint. Interior walls painted with primer coat and one finish coat of acrylic latex in standard neutral colour. Paint upgrades available. Concrete ceilings painted white. Finish will vary suite to suite based on surface condition. White 4” contemporary baseboards and 2 ¼” casings with semi-gloss finish. Fire-rated flat panel painted suite entry doors. 5 panel painted doors within suite. Insulated metal clad balcony door(s) with full height insulated glass. Lever matte black door hardware throughout. Privacy locks to master bedroom and all bathrooms. 9’-6” floor to ceiling heights with dropped bulkheads on main floor. 8’-6” floor to ceiling heights with dropped bulkheads on second to seventh floor. Wire shelving in closets. FLOOR COVERINGS Luxury vinyl plank flooring throughout suite and in closets with hot water tanks and laundry alcoves. Planks come in 6” x 48” size. Carpet with 4 lb underpad in bedrooms only. Flooring upgrades available. Tile flooring and shower in Everest ensuite bathroom KITCHEN Flat panel melamine kitchen cabinets with engineered quartz countertops. Double-basin stainless steel undermount sinks. Single-lever Moen faucet with pull out spray. 4-piece black stainless steel appliance package included (refrigerator, range, dishwasher, and over- the-range microwave). Matte Black Moen high arc pulldown faucet. LED under cabinet lighting with bottom moldings BATHROOMS Flat panel thermofoil vanity cabinets with quartz countertops. Undermount sink. Round mirror above vanity cabinet. Single-lever Moen faucets. White one piece acrylic bathtub/shower unit in main bathroom equipped with shower rod without curtain. White one piece acrylic shower stall in ensuite bathrooms equipped with clear glass door. Curb-less tile shower in ensuite of Everest suits FIRE PROTECTION Comprehensive fire alarm system includes full fire suppressing sprinkler system for all areas of the building. Early detection, hard wired, in-suite smoke and heat detectors. Emergency exit lighting and emergency stairways at each end of the building. Fire alarm horn and strobe lights at all bedrooms and bathrooms. SECURITY Secure lobby with access controlled digital interphone at both building entries. Closed circuit TV monitoring at the building access points is available with Shaw Digital TV or MTS Ultimate TV. Closed circuit TV at building access points are loop recorded on security system. Deadbolt and peep hole at suite entrances. Wireless in-suite security systems available from various service providers. (2) Key fobs provided per unit for entry into the building and suite entry. NATIONAL HOME WARRANTY PROGRAM Every condominium at The Rise Condominiums is enrolled for the National Home Warranty Program coverage. The National Home Warranty Program is recognized by CMHC and major lending institutions.
Location: 105 South Town Road
The Rise Phase 2 is located at 105 South Town Road, Winnipeg, Winnipeg.
- Walk Score: 27/100
- Transit Score: 30/100
Explore more pre-construction projects in Winnipeg or browse the Winnipeg region.
About the Developer: StreetSide Development Corporation
The Rise Phase 2 is being developed by StreetSide Development Corporation.
See all StreetSide Development Corporation pre-construction projects.
How to Buy at The Rise Phase 2
- Register early. Allocation at The Rise Phase 2 in Winnipeg is released to platinum brokerages before any public opening, so the best floor plans and lowest release pricing go to registered buyers first.
- Review the price list and deposit structure. Deposit structures for The Rise Phase 2 are confirmed at each release and can differ for end users, investors and international buyers.
- Submit a worksheet. Worksheets rank your preferred suites or lots; they are not binding until the developer issues an allocation.
- Sign and use your cooling-off period. Ontario pre-construction condominium purchases carry a 10-day statutory rescission period for lawyer and lender review. Freehold purchases do not.
Closing Costs & Investor Notes for The Rise Phase 2
Budget beyond the purchase price at The Rise Phase 2: development and education levies (usually capped by amendment), Tarion enrolment, utility meter hook-ups, land transfer tax, HST treatment (the federal/provincial new-housing rebate applies to buyers who occupy or, for investors, the rental rebate applies with a one-year lease), and legal fees. Estimated maintenance is $0 per sq ft per month.
Assignment rights, rental-during-occupancy rights and capped levies vary release to release at The Rise Phase 2. Confirm each in the current agreement of purchase and sale before you sign.
The Rise Phase 2 — Frequently Asked Questions
Where is The Rise Phase 2 located?
The Rise Phase 2 is located at 105 South Town Road, Winnipeg.
Who is the developer of The Rise Phase 2?
The Rise Phase 2 is being developed by StreetSide Development Corporation.
How much do units at The Rise Phase 2 cost?
Pricing for The Rise Phase 2 has not been publicly released. Registered buyers receive the price list first.
When is occupancy at The Rise Phase 2?
Estimated occupancy for The Rise Phase 2 is 2022-01-01.
How many units are in The Rise Phase 2?
The Rise Phase 2 is planned as a 7-storey condo development.
How do I get platinum or VIP access to The Rise Phase 2?
Circle Real Estate provides platinum access to The Rise Phase 2, including first access to floor plans, the price list and worksheet submission. Register on this page to be added to the VIP list.
Similar Pre-Construction Projects in Winnipeg
- The Meridian Towns — Winnipeg
- Devonshire Park by Daytona Homes — Winnipeg
- Grand Pacific Gardens — Winnipeg
- Flora West Condos — Winnipeg
- Ridgewood West by Sterling Homes Winnipeg — Winnipeg
- Prairie Pointe by Randall Homes — Winnipeg
- Devonshire Park by Randall Homes — Winnipeg
- 390 On The River Condos — Winnipeg
Register for The Rise Phase 2 pricing, floor plans and VIP access on Circle Real Estate.
Last verified: 2026-09-27. Source: RedBricks project feed. Published by Circle Real Estate Brokerage. Prices and incentives are subject to change without notice. E. & O.E.